{"id":9353,"date":"2025-07-09T05:52:11","date_gmt":"2025-07-09T05:52:11","guid":{"rendered":"https:\/\/www.oepb.org\/web\/?p=9353"},"modified":"2025-07-09T05:52:11","modified_gmt":"2025-07-09T05:52:11","slug":"transportes-acelera-la-conexion-entre-el-puerto-de-castellon-y-el-corredor-mediterraneo","status":"publish","type":"post","link":"https:\/\/www.oepb.org\/web\/2025\/07\/09\/transportes-acelera-la-conexion-entre-el-puerto-de-castellon-y-el-corredor-mediterraneo\/","title":{"rendered":"Transportes acelera la conexi\u00f3n entre el puerto de Castell\u00f3n y el Corredor Mediterr\u00e1neo\u00a0"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Por&nbsp;<\/strong><a href=\"https:\/\/www.diarioelcanal.com\/author\/elcanal\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>El Canal Mar\u00edtimo y Log\u00edstico<\/strong><\/a><strong>&nbsp;&#8211;<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">8 julio, 2025&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Ministerio de Transportes y Movilidad Sostenible ha adjudicado por 12 millones de euros el montaje de v\u00eda y la electrificaci\u00f3n del nuevo&nbsp;<a href=\"https:\/\/www.diarioelcanal.com\/electrificacion-portuaria-castellon\/\" target=\"_blank\" rel=\"noreferrer noopener\">acceso Sur al puerto de Castell\u00f3n<\/a>. De este importe, hasta 9,5 millones ir\u00e1n destinados a la construcci\u00f3n de la plataforma ferroviaria en los primeros 100 metros del trazado y a la conexi\u00f3n con el Corredor Mediterr\u00e1neo.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">De hecho, seg\u00fan especific\u00f3 el Ministerio en la jornada del lunes 7 de julio, estas dos \u00faltimas actuaciones suponen el \u201cgrueso\u201d de este paquete de inversiones, ya que alcanzan los 9,5 millones de euros.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Asimismo, las operaciones de montaje por 9,5 millones de euros tambi\u00e9n incluyen: la reposici\u00f3n de las instalaciones ferroviarias afectadas (electrificaci\u00f3n, telecomunicaciones y se\u00f1alizaci\u00f3n); y la instalaci\u00f3n de pantallas de protecci\u00f3n ac\u00fastica, cerramientos y medidas de integraci\u00f3n ambiental.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Adem\u00e1s, tambi\u00e9n se ha adjudicado por otros 2,2 millones de euros el montaje del sistema de electrificaci\u00f3n del ramal, que proporcionar\u00e1 energ\u00eda de tracci\u00f3n a los trenes.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Avance de las obras del nuevo acceso al puerto de Castell\u00f3n<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Estos trabajos se enmarcan en una inversi\u00f3n total prevista de 335,5 millones de euros para la ejecuci\u00f3n de este enlace de uso exclusivo para mercanc\u00edas (8,3 km en v\u00eda \u00fanica electrificada y de ancho mixto, apta para circulaciones en ancho est\u00e1ndar y ancho convencional), que permitir\u00e1 la entrada de trenes al recinto portuario por la d\u00e1rsena Sur.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cEsta actuaci\u00f3n permitir\u00e1 la entrada de trenes al recinto portuario por la&nbsp;<a href=\"https:\/\/www.diarioelcanal.com\/el-puerto-de-castellon-promociona-su-proyecto-de-expansion-en-la-darsena-sur\/\" target=\"_blank\" rel=\"noreferrer noopener\">d\u00e1rsena Sur<\/a>, conectando el puerto de Castell\u00f3 con el Corredor Mediterr\u00e1neo e impulsando el tr\u00e1fico intermodal de mercanc\u00edas y, con \u00e9l, una movilidad m\u00e1s eficiente, competitiva y sostenible\u201d, se\u00f1al\u00f3 el Ministerio.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cabe recordar que la ejecuci\u00f3n del proyecto constructivo de v\u00eda del nuevo acceso ferroviario sur al puerto de Castell\u00f3n cuenta con financiaci\u00f3n europea a trav\u00e9s del Plan de Recuperaci\u00f3n, Transformaci\u00f3n y Resiliencia, financiado por la Uni\u00f3n Europea \u2013 NextGenerationEU.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"767\" src=\"https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2025\/07\/Castello-connexio-1024x767.webp\" alt=\"\" class=\"wp-image-9354\" srcset=\"https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2025\/07\/Castello-connexio-1024x767.webp 1024w, https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2025\/07\/Castello-connexio-300x225.webp 300w, https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2025\/07\/Castello-connexio-768x575.webp 768w, https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2025\/07\/Castello-connexio.webp 1152w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Por&nbsp;El Canal Mar\u00edtimo y Log\u00edstico&nbsp;&#8211;&nbsp; 8 julio, 2025&nbsp; El Ministerio de Transportes y Movilidad Sostenible ha adjudicado por 12 millones de euros el montaje de v\u00eda y la electrificaci\u00f3n del nuevo&nbsp;acceso Sur al puerto de Castell\u00f3n. De este importe, hasta 9,5 millones ir\u00e1n destinados a la construcci\u00f3n de la plataforma ferroviaria en los primeros 100 &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.oepb.org\/web\/2025\/07\/09\/transportes-acelera-la-conexion-entre-el-puerto-de-castellon-y-el-corredor-mediterraneo\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abTransportes acelera la conexi\u00f3n entre el puerto de Castell\u00f3n y el Corredor Mediterr\u00e1neo\u00a0\u00ab<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":9354,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-9353","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-estatales"],"_links":{"self":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts\/9353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/comments?post=9353"}],"version-history":[{"count":1,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts\/9353\/revisions"}],"predecessor-version":[{"id":9355,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts\/9353\/revisions\/9355"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/media\/9354"}],"wp:attachment":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/media?parent=9353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/categories?post=9353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/tags?post=9353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}