{"id":7955,"date":"2024-11-14T10:36:49","date_gmt":"2024-11-14T10:36:49","guid":{"rendered":"https:\/\/www.oepb.org\/web\/?p=7955"},"modified":"2024-11-14T10:36:49","modified_gmt":"2024-11-14T10:36:49","slug":"adjudicada-la-ampliacion-y-electrificacion-de-la-terminal-de-apm-en-rotterdam","status":"publish","type":"post","link":"https:\/\/www.oepb.org\/web\/2024\/11\/14\/adjudicada-la-ampliacion-y-electrificacion-de-la-terminal-de-apm-en-rotterdam\/","title":{"rendered":"Adjudicada la ampliaci\u00f3n y electrificaci\u00f3n de la terminal de APM en Rotterdam"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Las 51 hect\u00e1reas incluir\u00e1n 31 bloques de patio adicionales, lo que duplicar\u00e1 la capacidad de la terminal<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>&nbsp;<a href=\"https:\/\/www.diarioelcanal.com\/author\/elcanal\/\">El Canal Mar\u00edtimo y Log\u00edstico<\/a><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">13 noviembre, 2024<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El contrato de obras y electrificaci\u00f3n para la&nbsp;<strong>ampliaci\u00f3n de la terminal de contenedores Maasvlakte II (MVII) de APM Terminals en el puerto de Rotterdam<\/strong>&nbsp;ha sido adjudicado a CareGo, un consorcio formado por ABB, Dura Vermeer y GMB.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La ampliaci\u00f3n abarcar\u00e1 un patio de&nbsp;<a href=\"https:\/\/www.diarioelcanal.com\/tag\/contenedores\/\">contenedores<\/a>&nbsp;de 51 hect\u00e1reas, lo que duplicar\u00e1 la capacidad de la terminal, convirti\u00e9ndola en una de las&nbsp;<strong>terminales totalmente automatizadas m\u00e1s avanzadas del mundo.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las 51 hect\u00e1reas incluir\u00e1n 31 bloques de patio adicionales, zona de muelles, zonas para camiones y trenes e infraestructuras asociadas. El puerto de Rotterdam ya ha construido 1.000 metros de nuevo muelle para la ampliaci\u00f3n de las instalaciones, y aunque no han trascendido nuevos datos econ\u00f3micos ni financieros sobre la ampliaci\u00f3n, el a\u00f1o pasado se anunci\u00f3 que las obras contar\u00edan con una&nbsp;<a href=\"https:\/\/www.diarioelcanal.com\/terminal-apm-rotterdam\/\">inversi\u00f3n de m\u00e1s de 1.000 millones de euros<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La ampliaci\u00f3n abarcar\u00e1 51 hect\u00e1reas y duplicar\u00e1 la capacidad de la terminal<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ABB se encargar\u00e1 de la electrificaci\u00f3n de la terminal con subestaciones y centros de datos prefabricados, iluminaci\u00f3n de la terminal, red de fibra \u00f3ptica y suministro de energ\u00eda a gr\u00faas y contenedores frigor\u00edficos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por su parte,&nbsp;<strong>Dura Vermeer<\/strong>&nbsp;y&nbsp;<strong>GMB<\/strong>&nbsp;se ocupar\u00e1n de las obras civiles, incluidos los pavimentos, los cimientos de hormig\u00f3n, las v\u00edas para gr\u00faas, los bastidores para contenedores frigor\u00edficos, el vallado y la ampliaci\u00f3n de la terminal ferroviaria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>APM Terminals MVII<\/strong>&nbsp;espera convertirse en una de las terminales totalmente automatizadas m\u00e1s avanzadas del mundo, equipada para cargar y descargar los buques portacontenedores m\u00e1s grandes.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2024\/11\/Rotterdam-1024x682.jpg\" alt=\"\" class=\"wp-image-7956\" srcset=\"https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2024\/11\/Rotterdam-1024x682.jpg 1024w, https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2024\/11\/Rotterdam-300x200.jpg 300w, https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2024\/11\/Rotterdam-768x511.jpg 768w, https:\/\/www.oepb.org\/web\/wp-content\/uploads\/2024\/11\/Rotterdam.jpg 1200w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Las 51 hect\u00e1reas incluir\u00e1n 31 bloques de patio adicionales, lo que duplicar\u00e1 la capacidad de la terminal &nbsp;El Canal Mar\u00edtimo y Log\u00edstico 13 noviembre, 2024 El contrato de obras y electrificaci\u00f3n para la&nbsp;ampliaci\u00f3n de la terminal de contenedores Maasvlakte II (MVII) de APM Terminals en el puerto de Rotterdam&nbsp;ha sido adjudicado a CareGo, un consorcio &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.oepb.org\/web\/2024\/11\/14\/adjudicada-la-ampliacion-y-electrificacion-de-la-terminal-de-apm-en-rotterdam\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abAdjudicada la ampliaci\u00f3n y electrificaci\u00f3n de la terminal de APM en Rotterdam\u00bb<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":7956,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-7955","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-internacionales"],"_links":{"self":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts\/7955","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/comments?post=7955"}],"version-history":[{"count":1,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts\/7955\/revisions"}],"predecessor-version":[{"id":7957,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts\/7955\/revisions\/7957"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/media\/7956"}],"wp:attachment":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/media?parent=7955"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/categories?post=7955"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/tags?post=7955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}