{"id":11281,"date":"2026-07-23T05:55:55","date_gmt":"2026-07-23T05:55:55","guid":{"rendered":"https:\/\/www.oepb.org\/web\/?p=11281"},"modified":"2026-07-23T05:55:55","modified_gmt":"2026-07-23T05:55:55","slug":"el-puerto-de-bilbao-rompe-el-techo-de-capacidad-en-contenedores","status":"publish","type":"post","link":"https:\/\/www.oepb.org\/web\/2026\/07\/23\/el-puerto-de-bilbao-rompe-el-techo-de-capacidad-en-contenedores\/","title":{"rendered":"El\u00a0puerto\u00a0de Bilbao\u00a0rompe\u00a0el\u00a0techo\u00a0de\u00a0capacidad\u00a0en\u00a0contenedores\u00a0"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Recibe&nbsp;al&nbsp;mayor&nbsp;portacontenedores&nbsp;que&nbsp;haya&nbsp;atracado&nbsp;en&nbsp;sus&nbsp;muelles&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Por&nbsp;<\/strong><a href=\"https:\/\/www.diarioelcanal.com\/author\/elcanal\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>El Canal Mar\u00edtimo y Log\u00edstico<\/strong><\/a><strong>&nbsp;&#8211;<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">22&nbsp;julio, 2026&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El&nbsp;puerto&nbsp;de Bilbao&nbsp;est\u00e1&nbsp;de&nbsp;enhorabuena&nbsp;con la llegada del&nbsp;buque&nbsp;<em>MSC<\/em>&nbsp;<em>Ruby<\/em>, el&nbsp;mayor&nbsp;portacontenedores&nbsp;que&nbsp;haya&nbsp;escalado&nbsp;hasta&nbsp;la&nbsp;fecha&nbsp;en&nbsp;sus&nbsp;instalaciones, con una&nbsp;capacidad&nbsp;nominal de 13.000 teus.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Recordar que&nbsp;<a href=\"https:\/\/www.diarioelcanal.com\/el-puerto-de-bilbao-normaliza-la-llegada-de-megabuques-de-msc\/\" target=\"_blank\" rel=\"noreferrer noopener\">el puerto de Bilbao ha normalizado la llegada de grandes buques<\/a>&nbsp;de la&nbsp;compa\u00f1\u00eda&nbsp;naviera&nbsp;MSC a&nbsp;su&nbsp;terminal de&nbsp;contenedores&nbsp;con&nbsp;destinos&nbsp;en el&nbsp;otro&nbsp;lado&nbsp;del Atl\u00e1ntico y el&nbsp;Pac\u00edfico, con las&nbsp;escalas&nbsp;de&nbsp;sus&nbsp;servicios&nbsp;Canada Express Service, por un&nbsp;lado, y el NWC-USA-SAWC, por&nbsp;otro.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><img loading=\"lazy\" decoding=\"async\" width=\"601\" height=\"451\" src=\"blob:https:\/\/www.oepb.org\/5607377a-0600-4b6d-9af0-1baefb9c79a8\" alt=\"MSC-Ruby-puerto-de-bilbao\"><em>Con una&nbsp;capacidad&nbsp;de 13.000 teus, el&nbsp;buque&nbsp;rompe&nbsp;un&nbsp;r\u00e9cord&nbsp;en el&nbsp;puerto&nbsp;vasco<\/em>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El&nbsp;<em>MSC<\/em>&nbsp;<em>Ruby<\/em>, de la&nbsp;naviera&nbsp;MSC,&nbsp;cuenta&nbsp;con 366 metros de eslora, 48 metros de&nbsp;manga&nbsp;y&nbsp;capacidad&nbsp;para 13.000&nbsp;contenedores&nbsp;de 20 pies. Ha&nbsp;llegado&nbsp;a Bilbao a las 7&nbsp;horas&nbsp;de la&nbsp;ma\u00f1ana&nbsp;y se ha&nbsp;amarrado&nbsp;en la terminal de&nbsp;contenedores&nbsp;de CSP&nbsp;Iberian&nbsp;Bilbao Terminal.&nbsp;Proced\u00eda&nbsp;de Sines (Portugal) y,&nbsp;tras&nbsp;poco&nbsp;m\u00e1s&nbsp;de 24&nbsp;horas&nbsp;en&nbsp;puerto,&nbsp;contin\u00faa&nbsp;su&nbsp;viaje&nbsp;camino del&nbsp;puerto&nbsp;franc\u00e9s&nbsp;de Le Havre.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La terminal de CSP en el&nbsp;puerto&nbsp;de Bilbao&nbsp;dispone&nbsp;de 21 metros de&nbsp;calado&nbsp;y ha&nbsp;empleado&nbsp;para las&nbsp;operaciones&nbsp;del&nbsp;buque&nbsp;la&nbsp;<a href=\"https:\/\/www.diarioelcanal.com\/csp-estrena-en-bilbao-la-mayor-grua-portuaria-del-arco-atlantico\/\" target=\"_blank\" rel=\"noreferrer noopener\">nueva gr\u00faa super post panamax<\/a>, la de&nbsp;mayor&nbsp;dimensi\u00f3n&nbsp;del Arco Atl\u00e1ntico, inaugurada&nbsp;hace&nbsp;poco&nbsp;m\u00e1s&nbsp;de un mes.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este equipo&nbsp;permite&nbsp;incrementar&nbsp;sustancialmente&nbsp;la&nbsp;capacidad&nbsp;operativa de la terminal,&nbsp;aumentado&nbsp;la&nbsp;productividad&nbsp;y&nbsp;eficiencia&nbsp;en&nbsp;sus&nbsp;operaciones, al incorporar la \u00faltima&nbsp;tecnolog\u00eda&nbsp;y&nbsp;prestaciones&nbsp;disponibles para la carga y&nbsp;descarga&nbsp;de&nbsp;buques&nbsp;portacontenedores&nbsp;que&nbsp;operan&nbsp;en el&nbsp;puerto&nbsp;de Bilbao.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Con esta&nbsp;nueva&nbsp;m\u00e1quina&nbsp;Super&nbsp;Post&nbsp;Panamax,&nbsp;en la que la&nbsp;compa\u00f1\u00eda&nbsp;<a href=\"https:\/\/www.diarioelcanal.com\/csp-iberian-bilbao-terminal-suma-musculo-con-una-nueva-grua-sts-de-ultima-generacion\/\" target=\"_blank\" rel=\"noreferrer noopener\">CSP Iberian Bilbao Terminal<\/a>&nbsp;ha&nbsp;invertido&nbsp;9,5&nbsp;millones&nbsp;de euros, se&nbsp;pueden&nbsp;atender&nbsp;buques&nbsp;de&nbsp;hasta&nbsp;16.000 teus&nbsp;nominales, una&nbsp;dimensi\u00f3n&nbsp;hasta&nbsp;ahora&nbsp;inalcanzable&nbsp;para el&nbsp;enclave&nbsp;log\u00edstico&nbsp;vizca\u00edno.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Recibe&nbsp;al&nbsp;mayor&nbsp;portacontenedores&nbsp;que&nbsp;haya&nbsp;atracado&nbsp;en&nbsp;sus&nbsp;muelles&nbsp; Por&nbsp;El Canal Mar\u00edtimo y Log\u00edstico&nbsp;&#8211;&nbsp; 22&nbsp;julio, 2026&nbsp; El&nbsp;puerto&nbsp;de Bilbao&nbsp;est\u00e1&nbsp;de&nbsp;enhorabuena&nbsp;con la llegada del&nbsp;buque&nbsp;MSC&nbsp;Ruby, el&nbsp;mayor&nbsp;portacontenedores&nbsp;que&nbsp;haya&nbsp;escalado&nbsp;hasta&nbsp;la&nbsp;fecha&nbsp;en&nbsp;sus&nbsp;instalaciones, con una&nbsp;capacidad&nbsp;nominal de 13.000 teus.&nbsp; Recordar que&nbsp;el puerto de Bilbao ha normalizado la llegada de grandes buques&nbsp;de la&nbsp;compa\u00f1\u00eda&nbsp;naviera&nbsp;MSC a&nbsp;su&nbsp;terminal de&nbsp;contenedores&nbsp;con&nbsp;destinos&nbsp;en el&nbsp;otro&nbsp;lado&nbsp;del Atl\u00e1ntico y el&nbsp;Pac\u00edfico, con las&nbsp;escalas&nbsp;de&nbsp;sus&nbsp;servicios&nbsp;Canada Express Service, por un&nbsp;lado, y el NWC-USA-SAWC, por&nbsp;otro.&nbsp; Con una&nbsp;capacidad&nbsp;de 13.000 teus, el&nbsp;buque&nbsp;rompe&nbsp;un&nbsp;r\u00e9cord&nbsp;en el&nbsp;puerto&nbsp;vasco&nbsp; El&nbsp;MSC&nbsp;Ruby, &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.oepb.org\/web\/2026\/07\/23\/el-puerto-de-bilbao-rompe-el-techo-de-capacidad-en-contenedores\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abEl\u00a0puerto\u00a0de Bilbao\u00a0rompe\u00a0el\u00a0techo\u00a0de\u00a0capacidad\u00a0en\u00a0contenedores\u00a0\u00ab<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-11281","post","type-post","status-publish","format-standard","hentry","category-noticias-estatales"],"_links":{"self":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts\/11281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/comments?post=11281"}],"version-history":[{"count":1,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts\/11281\/revisions"}],"predecessor-version":[{"id":11282,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/posts\/11281\/revisions\/11282"}],"wp:attachment":[{"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/media?parent=11281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/categories?post=11281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oepb.org\/web\/wp-json\/wp\/v2\/tags?post=11281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}